Sethi House Progress

Sethi House Progress

Ar. Yasmeen Lari, CEO, Heritage Foundation and Hon. Project Director, Sethi House Conservation Project, visited the Sethi House on March 13th to examine the progress of work.

The  demolition of the non-historic portion that had been built some time in 1950s, had been carried out, which has cleared the area in the front of the house as a forecourt.

The work on the brick wall in the rear to stabilize the neighbours’ wall was partially completed.

On March 14th she called on Dr. Shah Nazar, Director, Directorate of Archaeology, Khyber Pakhtunkhwa. It was decided that the proposed workshop/seminar should be held some time during the middle of April.

A visit to the Sethi House was later made by the Director, as well as Mrs. Fareeda Nishtar, Member, Sethi House Committee .